Ulger, N. E.Ozer, U.Akkaya, U. G.2024-05-252024-05-2520111062-739110.1134/S10627391470401132-s2.0-84855771393https://doi.org/10.1134/S1062739147040113https://hdl.handle.net/20.500.14517/547Akkaya, Ufuk Gökhan/0000-0001-7575-7057; ozer, umit/0000-0001-5930-0321In this study, quality of quartzite ore body located at Istanbul Yalikoy Region is determined by geostatistical methods. After analysis of 303 production blocks, reserve of ore is calculated as 3 560 400 tonnes. Then 82 borehole data were compared with this study results, using geostatistical methods. For the study, a blending model was developed to provide the specific ore to the glass industry. The model and geostatistical study results for a quartzite deposit were evaluated by newly developed software based on GIS and pre-blending model.eninfo:eu-repo/semantics/closedAccessGlass industryquartzitekriginggeostatistical methodsblending formulablending softwareDetermination of quality of a quartzite deposit, model of pre-blending, and the developing software-bossArticleQ4Q3474483492WOS:0002984017000111