Investigation of cautious blasting model applied during tunneling of Üsküdar-Ümranİye-Çekmeköy subway construction

dc.authorscopusid 56946847800
dc.authorscopusid 56946825400
dc.contributor.author Bağdatlı,S.
dc.contributor.author Çeltikçi,A.
dc.date.accessioned 2024-10-15T20:22:38Z
dc.date.available 2024-10-15T20:22:38Z
dc.date.issued 2014
dc.department Okan University en_US
dc.department-temp Bağdatlı S., Vocational School, Okan University, Turkey; Çeltikçi A., Vocational School, Okan University, Turkey en_US
dc.description.abstract Traffic and transportation have become daunting problems in almost every metropolitan area in the world today. Public transportation systems appear to be the sole genuine solution to these problems. One of the most convenient types of transportation in metropolitan areas is subway systems. In Istanbul, a number of new subway lines are under construction to solve the ever-increasing traffic problem of the city. The Üsküdar-Ümraniye-Çekmeköy line is one of the most important subway lines under construction on the Asian side of the city since traffic congestion in this area is impossible to be tackled with in any other way. Because there is no suitable location for shaft opening within the construction area of the Bulgurlu station (the sixth station), an approach tunnel has been built by the NATM starting from a point 200 meters away from the station. This paper examines the blasting operations carried out during the excavation of the approach tunnel, focusing upon the vibrations induced by blasting and the effects of blasting on the residential structures. The Peak Particle Velocity (PPV) and frequency were measured and evaluated according to the USA (USBM) norms. During the 50 controlled blasting operations conducted until now, the vibrations were recorded 94 times by means of various technical apparatuses. By relating the vibration records to the scaled distance calculated on the basis of the explosive weights per delay, the ground transmission coefficient (K) and the geological coefficient (β) were found. © SGEM2014. en_US
dc.identifier.citationcount 0
dc.identifier.endpage 319 en_US
dc.identifier.issn 1314-2704
dc.identifier.issue 1 en_US
dc.identifier.scopus 2-s2.0-84946398459
dc.identifier.scopusquality Q4
dc.identifier.startpage 313 en_US
dc.identifier.uri https://hdl.handle.net/20.500.14517/6780
dc.identifier.volume 3 en_US
dc.language.iso en
dc.publisher International Multidisciplinary Scientific Geoconference en_US
dc.relation.ispartof International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, SGEM -- 14th International Multidisciplinary Scientific Geoconference and EXPO, SGEM 2014 -- 17 June 2014 through 26 June 2014 -- Albena -- 153879 en_US
dc.relation.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.scopus.citedbyCount 0
dc.subject Cautious blasting en_US
dc.subject NATM en_US
dc.subject Vibration measurement en_US
dc.title Investigation of cautious blasting model applied during tunneling of Üsküdar-Ümranİye-Çekmeköy subway construction en_US
dc.type Conference Object en_US

Files